Whitewater University Technology Park
COMMUNITY OVERVIEW
Whitewater is a vibrant community that brings together a unique combination of university life and small-town hospitality. With assets including the university of Wisconsin-Whitewater, employers have access to a youthful, educated population and a business community focused on growth. The Ice Age Trail is located just four miles to the east and extends for nearly 1,200 miles, from Minnesota to the shores of Lake Michigan, making Whitewater an appealing location both for companies and for the people they hire. Located on the border of Jefferson and Walworth Counties in southern Wisconsin, Whitewater provides convenient access to Interstate 90, connecting businesses to Madison (45 miles away), the Wisconsin/Illinois border (34 miles away), and Interstate 43, connecting businesses to Milwaukee (54 miles away). Residents and businesses also have easy access to Chicago, allowing for day trips to a larger metropolitan area. Whitewater has a population of over 14,000 people, with access to over 45,000 people within a 45-minute drive. The Whitewater University Technology Park is a 35-acre park located on the northeast side of the city. Close proximity to the Whitewater Innovation Center and UW-Whitewater allows businesses to tap into the innovation and creativity of a collegiate population and entrepreneurs in the area.Site Features & Contact
General surroundings fit for industrial activity
35.1 contiguous acres of buildable land
Access roads in place to site, or plans in place to extend access roads to site
No utility easements that would prevent development
Proximity to interstate and other highways
No wetlands present on the site
Commercial airport access
No known environmental impediments to immediate industrial development
Freight airport access
No known archaeological/historical impediments to immediate industrial development
No direct rail access
No known impediments to immediate development related to endangered species
American Land Trust Association (ALTA) survey
Fire insurance classification rating 3
Site not located on or adjacent to flood plain
Industrial zoning
Flight path certifications not proximate of any airport
Zoning of surrounding properties compatible with industrial development of site
No significant topography issues
Dave Carlson, Executive Director
Whitewater Community Development Authority
262-473-0148
dcarlson@whitewater-wi.govCommunity Intro
Requirement | Comments |
---|---|
Community overview
|
|
Site environment overview
|
|
Roadway access
|
|
Rail access (if applicable) – not required
|
|
Commercial airport access – access to airport(s) with commercial air service
|
|
Freight airport access – access to airport(s) with freight air service
|
|
Site Intro
Requirement | Comments |
---|---|
Master Site plan and/or site plan illustrating exact dimensions and number of parcels for the specific site being submitted for certification
|
|
Aerial photograph illustrating the specific site being submitted for certification as well as the surrounding properties |
|
ALTA Survey (American Land Trust Association) inclusive of site being submitted for certification |
|
Flood plain map (FEMA-produced FIRM map)
|
|
Flight path specifications (if site is within 2 miles of an airport)
|
|
Ownership – entire site must be wholly controlled by a single owner with documented willingness to sell to an industrial user |
|
Asking price – current asking price for sale or lease of the land must be indicated
|
|
Topography – no significant topography issues that could present major obstacles to industrial development of the site
|
|
Easements – site not intersected by utility or any other easement that would prevent development of 20 contiguous acres of the site
|
|
Wetlands – demonstrate that a user can utilize 20 contiguous acres that are not affected by wetlands
|
|
Environmental assessment – no known environmental impediments to immediate industrial development
|
|
Geotechnical – minimum of 5 soil borings (for 20-acre site); no presence of sinkholes or limestone caves; suitable water content/water table depth |
|
Archaeological/historical – no known archaeological/historical impediments to immediate industrial development |
|
Endangered species – no known impediments to immediate industrial development related to endangered species |
|
Fire protection
|
|
Zoning
Requirement | Comments |
---|---|
Industrial zoning (or equivalent) currently in place, or zoning change procedure underway as of field investigation
|
|
Surrounding area zoning – zoning of surrounding properties compatible with industrial development of site
|
|
Electric & Gas Utility Infrastructure
Requirement | Comments |
---|---|
Proximate electric power infrastructure availability and capacities
|
|
Detailed description of dual feed potential (current or proposed redundant service)
|
|
Introduction of any proposed improvements to/extensions of electric service to the site
|
|
Proximate natural gas infrastructure availability and capacities
|
We Energies is the natural gas provider and owns distribution and transmission lines that both run along the eastern boundary of the site:
|
Introduction of any proposed improvements to/extensions of natural gas service to the site
|
|
Proximate water and wastewater infrastructure availability and capacities |
|
Introduction of any proposed improvements to/extensions of water and/or wastewater service to the site |
|
FOLLOW US