Lake Wissota Business Park
COMMUNITY OVERVIEW
Chippewa Falls is located on the Chippewa River in Chippewa County, an hour east of the Twin Cities and adjacent to Eau Claire. The city’s 14,000 residents benefit from a diversified economy that successfully blends tourism, retail, agriculture, and industry. Chippewa Falls’ proximity to transportation; its highly trained, technically savvy workforce; and its beautiful setting have made it home to many large employers. Interstate 94 and U.S. Highways 12, 29, and 53 are major highway arteries for the community. Chippewa County recently received an international award for local college training programs focused on the local manufacturing industry: a consortium of about 19 local companies designed curriculum with Chippewa Valley Technical College. The Lake Wissota Business Park is a 200+ acre mixed-use development for industrial, office, and commercial uses. The southern portion of the business park is designated for office and high/medium-amenity development, while the northern portion of the park is designated for general industrial use.Site Features & Contact
General surroundings fit for industrial activity
No significant topography issues
Roadway access
No utility easements that would prevent development
Rail access
140 contiguous acres not affected by wetlands
Commercial airport access
No known environmental impediments to immediate industrial development
Freight airport access
No known archaeological/historical impediments to immediate industrial development
140 contiguous developable acres
No known impediments to immediate development related to endangered species
American Land Trust Association (ALTA) survey
Fire insurance classification rating 3
Site not located on or adjacent to flood plain
Industrial zoning
Flight path certifications not proximate of any airport
Single owner with documented willingness to sell
Charlie Walker, President/CEO
Chippewa County Economic Development Corporation
770 Technology Way
Chippewa Falls, WI 54729
715.723.7150
ccedc@chippewa-wi.comCommunity Intro
Requirement | Comments |
---|---|
Community overview
|
|
Site environment overview
|
|
Roadway access
|
|
Rail Access (if applicable) – not required
|
|
Commercial Airport Access – Access to airport(s) with commercial air service
|
|
Freight Airport Access – Access to airport(s) with freight air service |
|
Site Intro
Requirement | Comments |
---|---|
Master Site plan and/or site plan illustrating exact dimensions and number of parcels for the specific site being submitted for certification
|
|
Aerial photograph illustrating the specific site being submitted for certification as well as the surrounding properties |
|
ALTA Survey (American Land Trust Association) inclusive of site being submitted for certification |
|
Flood Plain map (FEMA-produced FIRM map)
|
|
Flight path specifications (if site is within 2 miles of an airport)
|
|
Ownership – entire site must be wholly controlled by a single owner with documented willingness to sell to an industrial user |
|
Asking Price – current asking price for sale or lease of the land must be indicated
|
|
Topography – no significant topography issues that could present major obstacles to industrial development of the site
|
|
Easements – site not intersected by utility or any other easement that would prevent development of 20 contiguous acres of the site
|
|
Wetlands – demonstrate that a user can utilize 20 contiguous acres that are not affected by wetlands |
|
Environmental Assessment – no known environmental impediments to immediate industrial development
|
|
Geotechnical – minimum of 5 soil borings (for 20-acre site); no presence of sink holes or limestone caves; suitable water content / water table depth |
|
Archaeological / Historical
|
|
Endangered Species – no known impediments to immediate industrial development related to endangered species |
|
Fire Protection
|
|
Zoning
Requirement | Comments |
---|---|
Industrial zoning (or equivalent) currently in place, or zoning change procedure underway as of field investigation
|
|
Surrounding area zoning – zoning of surrounding properties compatible with industrial development of site
|
|
Electric & Gas Utility Infrastructure
Requirement | Comments |
---|---|
Proximate electric power infrastructure availability and capacities
|
|
Detailed description of dual feed potential (current or proposed redundant service)
|
|
Introduction of any proposed improvements to/extensions of electric service to the site
|
|
Proximate natural gas infrastructure availability and capacities
|
|
Introduction of any proposed improvements to/extensions of natural gas service to the site
|
|
Proximate water and wastewater infrastructure availability and capacities |
|
Introduction of any proposed improvements to/extensions of water and/or wastewater service to the site |
FOLLOW US