Yellowstone Industrial Park
COMMUNITY OVERVIEW
Yellowstone Industrial Park is located on Marshfield’s southeast side, less than one mile from a four-lane U.S. highway and just 30 miles to the nearest interstate (I-39). Rail access is available in the southern portion of the park. The City of Marshfield owns the rail spurs within the industrial park, and no future right of way will be required. A beautiful multimodal trail bisects the industrial park. Lots can be subdivided to fit your needs. Marshfield boasts great companies in a variety of industries, including agriculture, manufacturing, medical, and transportation. A technical college and two-year university, along with highly ranked K-12 schools, provide lifelong learning.Site Features & Contact
100+ acres of greenfield under public control
Less than two miles from four-lane U.S. Hwy. 10 and just 30 miles to nearest interstate (I-39)
No known utility easements on site
Wetlands survey completed December 2020
Central Wisconsin Airport (CWA), located 40 miles from the property, offers commercial service with direct flights to MSP and O’Hare. CWA also offers freight service.
Rail-served by Canadian National Railway Company
Phase I Environmental Site Assessment completed April 2023 on ~146 acres
Archaeological and architecture/history review completed May 4, 2023
Endangered resources review completed April 2023
ALTA survey completed June 2023
Steve Barg
City Administrator
City of Marshfield
207 W. 6th St.
steve.barg@ci.marshfield.wi.us
715.486.2003
ci.marshfield.wi.us
Community Intro
Requirement | Comments |
---|---|
Community overview
|
|
Site environment overview
|
|
Roadway access
|
|
Rail Access (if applicable) – not required
|
|
Commercial Airport Access – Access to airport(s) with commercial air service |
|
Freight Airport Access – Access to airport(s) with freight air service |
|
Site Introduction
Requirement | Comments |
---|---|
Master Site plan and/or site plan illustrating exact dimensions and number of parcels for the specific site being submitted for certification
|
|
Aerial photograph illustrating the specific site being submitted for certification as well as the surrounding properties |
|
ALTA Survey (American Land Trust Association) inclusive of site being submitted for certification |
|
Flood Plain map (FEMA-produced FIRM map)
|
|
Ownership – entire site must be wholly controlled by a single owner with documented willingness to sell to an industrial user |
|
Asking Price – current asking price for sale or lease of the land must be indicated
|
|
Topography – no significant topography issues that could present major obstacles to industrial development of the site |
|
Easements – site not intersected by utility or any other easement that would prevent development of 20 contiguous acres of the site |
|
Wetlands – demonstrate that a user can utilize 20 contiguous acres that are not affected by wetlands
|
|
Environmental Assessment – no known environmental impediments to immediate industrial development |
|
Archaeological / Historical
|
|
Endangered Species – no known impediments to immediate industrial development related to endangered species |
|
Fire Protection
|
|
Geotechnical – minimum of 5 soil borings (for 50-acre site); no presence of sink holes or limestone caves; suitable water content / water table depth |
|
Zoning
Requirement | Comments |
---|---|
Industrial zoning (or equivalent) currently in place, or zoning change procedure underway as of field investigation
|
|
Surrounding area zoning – zoning of surrounding properties compatible with industrial development of site |
|
Comprehensive plan of area (if applicable) |
|
Zoning map of area including site (if applicable) |
|
Existing/planned zoning of surrounding land |
|
Codes, covenants, and restrictions on site and surrounding sites, as applicable |
|
Electric Utility Infrastructure
Requirement | Comments |
---|---|
Proximate electric power infrastructure availability and capacities |
|
Detailed description of dual feed potential (current or proposed redundant service) |
|
Description, cost and, timing of any proposed improvements to/extensions of electric service to the site |
|
Proximate natural gas infrastructure availability and capacities |
|
Proximate water and wastewater infrastructure availability and capacities |
|
FOLLOW US