Eagle Ridge Business Park
COMMUNITY OVERVIEW
Prescott is located in western Wisconsin, at the point where the St. Croix River meets the Mississippi River. Prescott is Wisconsin’s oldest river town on the Mississippi. The growing community, with a population exceeding 4,000, is a far-range suburb of Minneapolis and St. Paul. The city is just 20 miles from downtown St. Paul and 32 miles from downtown Minneapolis via Highway 10 and I-494W. Prescott’s location, where the St. Croix National Scenic Riverway and the mighty Mississippi River meet, makes it the northern gateway to the Wisconsin National Scenic Byway Great River Road. The location near those rivers fueled Prescott’s economy and today plays a significant role in its strong tourism industry, attracting visitors from Minnesota and Wisconsin. The 90-acre Eagle Ridge Business Park site is on the northeast side of Prescott, directly north of Prescott Industrial Park across Highway 10.Site Features & Contact
General surroundings fit for industrial activity
No significant topography issues
Roadway access
No utility easements that would prevent development
Rail access
90 contiguous acres not affected by wetlands
Commercial airport access
No known environmental impediments to immediate industrial development
Freight airport access
No known archaeological/historical impediments to immediate industrial development
90 contiguous developable acres
No known impediments to immediate development related to endangered species
American Land Trust Association (ALTA) survey
Fire insurance classification rating 4
Site not located on or adjacent to flood plain
Industrial zoning
Flight path certifications not proximate of any airport
Single owner with documented willingness to sell
Jayne Brand
City of Prescott
800 Borner Street
Prescott, WI 54021
715.262.5544
jbrand@prescottcity.orgCommunity Intro
Requirement | Comments |
---|---|
Community overview
|
|
Site environment overview
|
|
Roadway access
|
|
Rail Access (if applicable) – not required
|
|
Commercial Airport Access – Access to airport(s) with commercial air service
|
|
Freight Airport Access – Access to airport(s) with freight air service |
|
Site Intro
Requirement | Comments |
---|---|
Master Site plan and/or site plan illustrating exact dimensions and number of parcels for the specific site being submitted for certification
|
|
Aerial photograph illustrating the specific site being submitted for certification as well as the surrounding properties |
|
ALTA Survey (American Land Trust Association) inclusive of site being submitted for certification |
|
Flood Plain map (FEMA-produced FIRM map)
|
|
Flight path specifications (if site is within 2 miles of an airport)
|
|
Ownership – entire site must be wholly controlled by a single owner with documented willingness to sell to an industrial user
|
|
Asking Price – current asking price for sale or lease of the land must be indicated
|
|
Topography – no significant topography issues that could present major obstacles to industrial development of the site |
|
Easements – site not intersected by utility or any other easement that would prevent development of 20 contiguous acres of the site |
|
Wetlands – demonstrate that a user can utilize 20 contiguous acres that are not affected by wetlands |
|
Environmental Assessment – no known environmental impediments to immediate industrial development
|
|
Geotechnical – minimum of 5 soil borings (for 20-acre site); no presence of sink holes or limestone caves; suitable water content/water table depth |
|
Archaeological/Historical – no known archaeological/historical impediments to immediate industrial development |
|
Endangered Species – no known impediments to immediate industrial development related to endangered species |
|
Fire Protection
|
|
Zoning
Requirement | Comments |
---|---|
Industrial zoning (or equivalent) currently in place, or zoning change procedure underway as of field investigation
|
|
Surrounding area zoning – zoning of surrounding properties compatible with industrial development of site
|
|
Electric & Gas Utility Infrastructure
Requirement | Comments |
---|---|
Proximate electric power infrastructure availability and capacities
|
|
Detailed description of dual feed potential (current or proposed redundant service)
|
|
Introduction of any proposed improvements to/ extensions of electric service to the site
|
|
Proximate natural gas infrastructure availability and capacities
|
|
Introduction of any proposed improvements to/extensions of natural gas service to the site |
|
Proximate water and wastewater infrastructure availability and capacities |
|
Introduction of any proposed improvements to/extensions of water and/or wastewater service to the site |
|
FOLLOW US